At the beginning of the Petrol Log Splitter trial operation, the straight material testing machine with a length of about 2 meters and a length of 4 meters should be selected according to the small, medium and large models, avoiding the use of special hardwood and super large diameter, too curved raw material testing machines. The following cnsuperpower explain to you how to maintain the circuit check of Petrol Log Splitter:

One. The equipment is placed stably, and the installation direction is determined according to the actual situation on site and the raw materials. Generally, small models do not need to be manufactured with basics, and users can use them directly on the testing machine. For medium-sized and above equipment, the main machine foundation and basic foundation of the in and out conveying system should be made according to the basic drawings provided by the manufacturer, and then the professional and technical personnel designated by the manufacturer should guide and install;

  1. Before use, check whether the circuit and the oil circuit are connected safely according to the instruction manual. In general, the tension of each chain, V-belt and transmission mechanism is adjusted when the equipment leaves the factory, or it can be adjusted by the on-site installation personnel of the manufacturer. The user should check frequently during the future use.
  2. The blades are alloy steel products. After long-term use, if worn or replaced, you can loosen the fastening screws of the blade, remove the blade for grinding and adjustment, and when the wear is too large, replace the new type of blade;

four. When the power is turned on, connect the 380V three-phase power supply from the switch box or switch cabinet. First, check whether there are debris and branches around the equipment that affect the operation. After energizing, first determine the direction of rotation of the feed roller and let the equipment idle for about 5 minutes. Listen carefully and observe whether the equipment is abnormal.

The above is how to maintain the circuit of Performance Built Log Splitter explained by cnsuperpower, I hope it will help you!