Installation of the degassing unit
Switch off the heating unit after degassing unit heating is completed. Guide inert gas into the rotor and release molten aluminum into the box when the heater temperature is closed to molten aluminum temperature. Check the sealing between inlet/outlet and launder. Check the cone located in heat protection draining in the bottom. Check the molten aluminum temperature (min 720°C). Make the...
0 Comments 0 Shares 541 Views 0 Reviews