Correct Adjustment of Pipe Fittings Mould Before Use
1. Pre-inspection of mould: Before loading the Pipe Fittings Mould with the injection moulding machine, the quality problem should be checked and found in time, and the mould can be removed after the mould is installed. When checking the fixed mould plate and the moving mould plate respectively, attention should be paid to direction marking to avoid mould clamping. 2. Oblique guide...
0 Comments 0 Shares 523 Views 0 Reviews