• How to operate extruder machine?


    Extruder machines are used extensively in the plastics industry. The machine is utilized by plastic engineers to turn raw plastic pellets or granules into the processed forms. The resultant products include plastic sheets or long pieces such as gutters and pipes.Get more news about https://www.usedpipefittingmould.com used pvc extruder,you can vist our website!

    PVC extruder machines are highly efficient as the process high volumes which require only a little post-processing refinement.

    When making different plastic products, the operating points of the extruder are different, but there are similarities. The following briefly introduces the same operating steps when extruding various products and the main points of the extruder that should be noted.
    1. Preparations before driving
    (1)The raw materials should meet the required drying requirements and further drying if necessary. And the raw materials are sieved to remove agglomerates and mechanical impurities.

    (2)Check whether the water, electricity and gas systems in the equipment are normal to ensure that the water and gas paths are unobstructed, that the electrical system is normal, that the heating system, temperature control, and various instruments are working reliably.

    (3)Install the tube extrusion machine head and setting sleeve. According to the product's variety and size, choose the specifications of the machine head. Install the machine head in the following order.

    2. Drive

    (1)You can drive after the temperature is constant. Tighten the bolts of the machine head and the extruder ****** again before driving to eliminate the difference in thermal expansion between the bolts and the machine head. The order of tightening the machine head bolts is diagonal, and the force should be uniform. When tightening the ****** nut of the machine head, the tightness around the four sides is required, otherwise, the material will run away.
    (2)To drive, first press the "ready to drive" button, then connect to the "drive" button, and then slowly rotate the screw speed adjustment **** to start the screw speed slowly. Then gradually speed up while adding a small amount. Pay close attention to the change of the indication of the host ammeter and various indication meters when feeding.

    (3)When the die is uniformly discharged and plasticized well, the styling sleeve can be pulled. Judgment of plasticization degree should be based on experience. Generally, it can be judged based on the appearance of the extruded material, that is, the surface is shiny, no impurities, no foaming, coke and discoloration. The burrs and cracks have some elasticity, which indicates that the material is well plasticized. If the plasticization is not good, the screw speed, barrel and head temperature can be adjusted appropriately until it meets the requirements.
    How to operate extruder machine? Extruder machines are used extensively in the plastics industry. The machine is utilized by plastic engineers to turn raw plastic pellets or granules into the processed forms. The resultant products include plastic sheets or long pieces such as gutters and pipes.Get more news about https://www.usedpipefittingmould.com used pvc extruder,you can vist our website! PVC extruder machines are highly efficient as the process high volumes which require only a little post-processing refinement. When making different plastic products, the operating points of the extruder are different, but there are similarities. The following briefly introduces the same operating steps when extruding various products and the main points of the extruder that should be noted. 1. Preparations before driving (1)The raw materials should meet the required drying requirements and further drying if necessary. And the raw materials are sieved to remove agglomerates and mechanical impurities. (2)Check whether the water, electricity and gas systems in the equipment are normal to ensure that the water and gas paths are unobstructed, that the electrical system is normal, that the heating system, temperature control, and various instruments are working reliably. (3)Install the tube extrusion machine head and setting sleeve. According to the product's variety and size, choose the specifications of the machine head. Install the machine head in the following order. 2. Drive (1)You can drive after the temperature is constant. Tighten the bolts of the machine head and the extruder flange again before driving to eliminate the difference in thermal expansion between the bolts and the machine head. The order of tightening the machine head bolts is diagonal, and the force should be uniform. When tightening the flange nut of the machine head, the tightness around the four sides is required, otherwise, the material will run away. (2)To drive, first press the "ready to drive" button, then connect to the "drive" button, and then slowly rotate the screw speed adjustment knob to start the screw speed slowly. Then gradually speed up while adding a small amount. Pay close attention to the change of the indication of the host ammeter and various indication meters when feeding. (3)When the die is uniformly discharged and plasticized well, the styling sleeve can be pulled. Judgment of plasticization degree should be based on experience. Generally, it can be judged based on the appearance of the extruded material, that is, the surface is shiny, no impurities, no foaming, coke and discoloration. The burrs and cracks have some elasticity, which indicates that the material is well plasticized. If the plasticization is not good, the screw speed, barrel and head temperature can be adjusted appropriately until it meets the requirements.
    Used pipe fitting mold|Used injection molding machine|Used extruder
    Shandong Gangfeng International Trade Co., Ltd. specializes in the development of needle valve preform molds, various bottle cap molds, automatic flip molds, medical injection molds, packaging molds, pipe fitting molds, bottle blowing molds, household molds, etc. Used pipe fitting mould, used injection molding machine, used extruder.
    0 Comments 0 Shares 672 Views 0 Reviews
  • Diving Drysuit
    1、Trilaminate butyl material
    2、Apeak inflation and exhaust valves
    3、Removable latex neck & wrist gaskets
    4、BDM heavy-duty aquaseal diagonal frontentry zip
    5、Can be used for longer dives and cold water
    Check it out on www.wetsuitdrysuit.com or contact us ✉
    #drysuit #diving #odm #oem #manufacture
    Diving Drysuit 1、Trilaminate butyl material 2、Apeak inflation and exhaust valves 3、Removable latex neck & wrist gaskets 4、BDM heavy-duty aquaseal diagonal frontentry zip 5、Can be used for longer dives and cold water Check it out on 🌐www.wetsuitdrysuit.com or contact us ✉ #drysuit #diving #odm #oem #manufacture
    0 Comments 0 Shares 827 Views 0 Reviews
  • Rs40000 - Rs120000 / Month
    Location
    Sankhamul, Lalitpur
    Type
    Full Time
    Status
    Open
    Established in 2018 A.D., Diagonal Technologies is a software development company with a bunch of young enthusiasts trying to solve problems on Information Technology. Here, we work as a team on finding strategic, new solutions to all of your business challenges.
    Established in 2018 A.D., Diagonal Technologies is a software development company with a bunch of young enthusiasts trying to solve problems on Information Technology. Here, we work as a team on finding strategic, new solutions to all of your business challenges.
    0 Comments 0 Shares 162 Views 0 Reviews
  • What Is #Diagonal #Communication? What Are Its #Core #Functions
    https://www.qualitywrites.co.uk/2021/10/what-is-diagonal-communication-what-are.html
    What Is #Diagonal #Communication? What Are Its #Core #Functions https://www.qualitywrites.co.uk/2021/10/what-is-diagonal-communication-what-are.html
    WWW.QUALITYWRITES.CO.UK
    What Is Diagonal Communication? What Are Its Core Functions?
    Organisational Communication Communication is a key element for maintaining the culture of mutual interaction. This is found between the mem...
    0 Comments 0 Shares 28 Views 0 Reviews
  • If you are looking for Everest Expedition 2022 Please PM us,
    Everest Expedition 2022 $35000.00 Per Person with Island Peak
    Lhotse Expedition 2022 $19500.00
    Name of the Peak Mt. Everest with Island Peak
    Duration 56 Days
    Region Khumbu Region (Everest)
    Best Season Spring & Autumn
    Accommodation Hotel/Lodge/Camping
    Grade Extreme Challenging
    Maximum Altitude 8848.86 M
    Country Nepal
    Price Per Person US $35,000.00
    Fixed Departure: 7 April, 2022
    Itinerary:
    5 April: Arrival in Kathmandu & transfer to the hotel
    6 April: Official formalities and Shopping in Kathmandu
    7 April: Drive to Airport, fly to Lukla & commence trek to Phakding
    8 April: Trek to Namche Bazaar
    9 April: Acclimatization day at Namche
    10 April: Trek to Tengboche
    11 April: Trek to Dingboche
    12 April: Rest day in Dingboche
    13 April: Trek to Chhukung
    14 April: Rest and acclimatization
    15 April: Trek to Island Peak Base Camp
    16 April: Summit Island Peak and return back to Chhukung
    17 April: Rest day
    18 April: Trek to Lobuche
    19 April: Trek to Everest Base Camp
    20-25 April: We carry out following activities:
    1. Acclimatization
    2. Prayer Ceremony
    3. Training: ladder practice, fixed lines, diagonal ascent/descent, traverse, duck walk, classical/flat footing, using oxygen etc.
    26 April: Climb to Camp I o/n
    27 April: Climb to Camp II o/n
    28 April: Rest and acclimatization
    29 April: Hike up to West Shoulder
    30 April: Touch Camp III, return back to Camp II o/n
    1 May: Descend to Base Camp
    2-8 May: Descend to Namche for rest, evaluate weather conditions for summit rotation. Direct fly back to Kathmandu for good rest (for those who can afford budget)
    9-12 May: Back to Base Camp and final preparation for summit push
    13 May: Climb to Camp II o/n
    14 May: Rest at Camp II
    15 May: Climb to Camp III o/n (from here on we will use oxygen)
    16 May: Climb to Camp IV o/n
    17 May: Rest at Camp IV (in case of bad weather)
    18 May: Summit Mt. Everest and return back to Camp IV (if possible lower camps)
    19 May: Descend to Camp II
    20 May: Descend to Base Camp
    21 May: Cleaning up Base Camp
    22 May: Trek back to Pheriche or Direct flight to KTM by Heli
    23 May: Trek to Namche
    24 May: Trek to Lukla
    25 May: Fly to Ktm
    26 May: Final Departure
    27-31 May:Extra days in case of bad weather, etc. (contingency)
    Note: If the above itinerary does not meet your needs, it can be customized as per your requirement.
    If you are looking for Everest Expedition 2022 Please PM us, Everest Expedition 2022 $35000.00 Per Person with Island Peak Lhotse Expedition 2022 $19500.00 Name of the Peak Mt. Everest with Island Peak Duration 56 Days Region Khumbu Region (Everest) Best Season Spring & Autumn Accommodation Hotel/Lodge/Camping Grade Extreme Challenging Maximum Altitude 8848.86 M Country Nepal Price Per Person US $35,000.00 Fixed Departure: 7 April, 2022 Itinerary: 5 April: Arrival in Kathmandu & transfer to the hotel 6 April: Official formalities and Shopping in Kathmandu 7 April: Drive to Airport, fly to Lukla & commence trek to Phakding 8 April: Trek to Namche Bazaar 9 April: Acclimatization day at Namche 10 April: Trek to Tengboche 11 April: Trek to Dingboche 12 April: Rest day in Dingboche 13 April: Trek to Chhukung 14 April: Rest and acclimatization 15 April: Trek to Island Peak Base Camp 16 April: Summit Island Peak and return back to Chhukung 17 April: Rest day 18 April: Trek to Lobuche 19 April: Trek to Everest Base Camp 20-25 April: We carry out following activities: 1. Acclimatization 2. Prayer Ceremony 3. Training: ladder practice, fixed lines, diagonal ascent/descent, traverse, duck walk, classical/flat footing, using oxygen etc. 26 April: Climb to Camp I o/n 27 April: Climb to Camp II o/n 28 April: Rest and acclimatization 29 April: Hike up to West Shoulder 30 April: Touch Camp III, return back to Camp II o/n 1 May: Descend to Base Camp 2-8 May: Descend to Namche for rest, evaluate weather conditions for summit rotation. Direct fly back to Kathmandu for good rest (for those who can afford budget) 9-12 May: Back to Base Camp and final preparation for summit push 13 May: Climb to Camp II o/n 14 May: Rest at Camp II 15 May: Climb to Camp III o/n (from here on we will use oxygen) 16 May: Climb to Camp IV o/n 17 May: Rest at Camp IV (in case of bad weather) 18 May: Summit Mt. Everest and return back to Camp IV (if possible lower camps) 19 May: Descend to Camp II 20 May: Descend to Base Camp 21 May: Cleaning up Base Camp 22 May: Trek back to Pheriche or Direct flight to KTM by Heli 23 May: Trek to Namche 24 May: Trek to Lukla 25 May: Fly to Ktm 26 May: Final Departure 27-31 May:Extra days in case of bad weather, etc. (contingency) Note: If the above itinerary does not meet your needs, it can be customized as per your requirement.
    Like
    Love
    Angry
    6
    2 Comments 0 Shares 272 Views 0 Reviews