3200 Amp Service Entrance Friday Floor Gear!!

Finally we are pumped to show off this gear, after so many designs, reviews, changes, and build challenges due to following reasons we finally did it. Having just stair access to electrical room in basement this unit needed the ability to split apart and put back together. Parallel bus work due to heavy amperage Really tight and compact footprint Lots of bus bracing due to high kA requirement This 3200 amp 120/208V service entrance rated gear contains a main 3200-amp breaker, utility section, breaker control section, line and load cable connection section, a busway, 3 high feeder breaker section and a PDU section with 1200 amp & 400-amp switchboards hard bussed to the main bus. This will be disassembled in several pieces, carried through stairs, and assembled in place again. If you have a challenging project including service entrance equipment, metering compartments, retrofit or transition kits we are always ready to jump on and design a solution for you.

To know more visit here: https://www.linkedin.com/posts/jazz-matharu-56331830_serviceentrance-mainbreaker-utility-activity-7052690404374155264-CIAJ?utm_source=share&utm_medium=member_desktop
3200 Amp Service Entrance Friday Floor Gear!! Finally we are pumped to show off this gear, after so many designs, reviews, changes, and build challenges due to following reasons we finally did it. Having just stair access to electrical room in basement this unit needed the ability to split apart and put back together. Parallel bus work due to heavy amperage Really tight and compact footprint Lots of bus bracing due to high kA requirement This 3200 amp 120/208V service entrance rated gear contains a main 3200-amp breaker, utility section, breaker control section, line and load cable connection section, a busway, 3 high feeder breaker section and a PDU section with 1200 amp & 400-amp switchboards hard bussed to the main bus. This will be disassembled in several pieces, carried through stairs, and assembled in place again. If you have a challenging project including service entrance equipment, metering compartments, retrofit or transition kits we are always ready to jump on and design a solution for you. To know more visit here: https://www.linkedin.com/posts/jazz-matharu-56331830_serviceentrance-mainbreaker-utility-activity-7052690404374155264-CIAJ?utm_source=share&utm_medium=member_desktop
0 Comments 0 Shares 248 Views 0 Reviews